Art Installations for Tom Fruin Studio


 

Water Tower 1(2012) - Welder, Fabricator (14’ Water Tower made of steel and salvaged colored plexiglass plus 10’ steel base)

 

Hotel (2012) - Lead Welder, Fabricator (50’ Hotel sign with large neon letters for the Wythe Hotel in Brooklyn) Wythe Hotel

 

Fun Rise (2012) - Fabricator (Aluminum sign with signage wrapped and riveted plus neon letters)

 

Color Studies(10) (2012-2014) - Lead Fabricator, designer, Lead Welder (small steel and plexiglass house(s) based off of earlier pieces)

 

Water tower 2 (2013) - Lead Welder, Lead Fabricator, Lead Installer (14’ Water Tower made of steel and salvaged colored plexiglass plus 10’ steel base)

 

Billboard 1 (2013) - Designer, Drafter, Lead Welder, Lead Fabricator (10’x20’ steel billboard based off of earlier drug bag piece)

 

Water tower 4 Dutchmasters (2014) -  Lead Fabricator, Lead Welder, Lead Installer (14’ Water Tower made of steel and salvaged colored plexiglass plus 10’ steel base)

 

Billboard Puzzle (2013) - Designer, Drafter, Lead Fabricator, Welder, Lead Installer (10’x20’ steel billboard broken up into 18 jigsaw puzzle pieces)

 

Water tower 4 (2014)- Designer, Drafter, Lead Fabricator, Welder (14’ Water Tower made of steel and salvaged colored plexiglass plus 10’ steel base)

 

Maxikiosco (2013/2014) - Lead Fabricator, Welder, Riveter (14’ House made of steel and colored plexiglass)

 

Lanterns (2014) - Lead Fabricator, Welder (gas powered lanterns made of steel and safety glass)

 

Steel Door (2014) - Lead Fabricator, Lead Welder, Riveter (9’x9’ steel fire door for personal collector)

 

Chalkboard (2014) - Lead Fabricator, Welder, Designer (smaller billboard style piece) Welder and Lead Installer (16' tall multi colored house)

 

Kolonihavehu (2014) -  Welder and Lead Installer (16' tall multi colored house) 

 

Water Tower 3 Rv Ingersol (2014) - Lead Welder, Lead Fabricator, Lead Installer (14’ Water Tower made of steel and salvaged colored plexiglass plus 10’ steel base)